Booral Road and Boundary Road (Urangan), intersection upgrade
Detailed design is underway for a proposed upgrade of the Booral Road and Boundary Road intersection...
Detailed design is underway for a proposed upgrade of the Booral Road and Boundary Road intersection...
The Department of Transport and Main Roads is undertaking detailed design for an upgrade of the Maryborough-Hervey Bay Road and Pialba-Burrum Heads Road intersection in Eli Waters...
This project aims to improve the flood immunity and reduce flood closure times at the Pialba–Burrum Heads Road crossing...
We are reconnecting communities and supporting regional economic recovery after disaster events damaged the state-controlled road network in 2020, 2021 and 2022...
The single-lane John Peterson Bridge will be replaced with a higher, safer, more flood-resistant 2-lane structure on an improved alignment...
Construction has started on flood immunity and road safety upgrades on Torbanlea – Pialba Road between Beelbi Creek and Takura...
The $1 billion Section D: Woondum to Curra (C2CD) project is a new 26km, 4-lane divided highway between the existing Bruce Highway interchange at Woondum, south of Gympie and Curra...
The project will develop a strategic level transport plan for local and state roads in the Bundaberg Regional Council area...
Isis Highway high risk roads targeted road safety program safety improvements...
Repairs are underway across South East Queensland after extensive and severe flooding was caused by sustained heavy rainfall in late February 2022...