| Flood damage restoration program | Mackay/Whitsunday, Central West, North West, Northern, Far North |
Flood damage restoration works on sections of the road network that were damaged as a result of monsoonal flooding from either cyclones Ellie or Charlotte in early 2009. Covers five Main Roads regions, north and west of Mackay.
|
| Forgan Bridge duplication | Mackay/Whitsunday |
Replacing the existing two-lane Forgan Bridge with a new four-lane bridge as well as upgrading the Kooyong intersection and Barnes Creek Bridge.
|
| Hospital Bridge replacement | Mackay/Whitsunday |
This project involves the construction of a new concrete bridge crossing over the Pioneer River to replace the existing low level timber bridge.
|
| Joint Levee Road | Mackay/Whitsunday |
This project involves the construction of a combined levee bank and two-lane road from Sams Road through to Kooyong Intersection, Mackay.
|
| Mackay Bucasia Road | Mackay/Whitsunday |
Duplication of Mackay-Bucasia Road Completion of the four-laning of the Mackay-Bucasia Road which links Mackay's Northern Beaches to the City centre.
|
| Mackay Southern Approaches Farrellys Lane | Mackay/Whitsunday |
This project involves the signalisation of the Farrellys Lane/Schmidtkes Road and Bruce Highway intersection as well as the duplication of the highway between Farrellys Lane and Boundary Road.
|
| Peak Downs Highway | Mackay/Whitsunday |
This project is to rehabilitate and widen an 8.1 km section of the highway as part of a long-term strategy to widen the Peak Downs Highway between Clermont and Moranbah.
|
| Traffic investigation at Walkerston | Mackay/Whitsunday |
An alternative route for through vehicles in Walkerston will enhance the efficiency of the Peak Downs Highway and improve pedestrian and local traffic safety.
|